Traffic Management & Transportation

BOS Administration Achievements (2019-Date)

  • Handed 15 brand new vehicles and 26 motorbikes to the Traffic Enforcement Team.
  • Recommenced construction work on the strategic Lagos/Badagry Expressway; and first phase of the road from Agboju to Trade Fair already completed.
  • Commenced reconstruction and upgrading of strategic roads such as the 6.05 kilometer Phase 1 Road from Itamaga to Ewu Elepe town, the 7.8 kilometers Owutu-Agric-Ishawo Road Phase 1 and Bola Tinubu-Igbogbo-Imota Road.
  • Massive repair on the Ojota stretch of Ikorodu Road and Motorways – Kudirat Abiola Way, Apongbon Highway and Lekki-Epe Expressway from Abraham Adesanya to Eleko Junction among others.
  • Reconstruction and upgrading of Igbogbo-Bola Ahmed Tinubu-Igbe Road, Ikorodu – ongoing
  • Commenced the rehabilitation of the 660m length loop Road Oregun and construction of two 30m long Bridges across the Odo-Alaro canal.
  • Embarked on the construction of the Agric-Access Road, Phase II, Igando, and the Deep Sea Port road and the Lekki-Ijebu-Ode-Ore Expressway.
  • The rehabilitation of Oba Sekumade Road is on-going, while Ipakodo, Ikorodu; Ijegun-Egbe Road and Ishuti Road, Igando has been completed.
  • Completed the Samuel Ekundayo/Toga road in Badagry LGA, Ishefun-Camp Davies-Ijon road network in Alimosho LGA, boundary roads with bridge (Phase II) to complement the network of twenty-one roads and two bridges in the axis.
  • Completed the Aradagun-Imeke-Iworo-Ajido-Epeme road(phase II) to complement the earlier concluded phase 1
  • Short-listed 8 contractors for the construction of the 4th Mainland Bridge.
  • Commenced the construction of 19.39-kilometre road network in Ijegun-Ijagemo and Ijedodo in Ojo Local Government.
  • Massive repair on the Ojota stretch of Ikorodu Road and Motorways – Kudirat Abiola Way, Apongbon Highway and Lekki-Epe Expressway from Abraham Adesanya to Eleko Junction among others.
  • Embarked on the rehabilitation and upgrading of the 6km phase I of 11 km long Ijede road.
  • Embarked on the construction of Lekki Regional Road, which include the Lekki free trade zone, Lekki Ports, Dangote Petrochemical Plant, Lekki Airports etc
  • Embarked on 90 palliatives and 261 sectional rehabilitations in Agege; Ajeromi Ifelodun; Alimosho; Amuwo-Odofin; Apapa; Badagry; Epe; Eti-Osa; Ifako-Ijaiye; Ikeja; Ikorodu; Kosofe; Lagos Island; Lagos Mainland; Mushin; Oshodi-Isolo; Shomolu and Surulere.
  • Restricted activities of motorcycles & tricycles in six LGAs & nine LCDAs to ensure safety of lives.
  • Completed and commissioned the new Vehicle Inspection Services headquarters; and deployed USSD Service (*554*381#) for verification of road worthiness certificate.
  • Commenced the Multi-level facility (car park) Onikan designed to accommodate 384 cars is at 83% completion, and another multi-Agency office complex with a capacity for over 700 vehicles.